ট্যাগ independent power producer

  • More power on stream, much more required

    Published on May 11, 2010 on bdnews24.com The 55 MW gas-fired rental power plant at Ashuganj is set for a formal launch on Wednesday, but the power-starved national grid needs many more to cope with the ever-increasing demand. After it was commissioned on Apr 7, the country’s total ‘installed’ capacity rose to 5,928 megawatt (MW),…

bn_BDবাংলা
Powered by TranslatePress